Chinese
русский язык
导航
Home
About us
Words of President
General Information
Programs
News and Events
International Education
Sino-Foreign Cooperation Programs
Overseas Campus
International Students
Students life
Application for Studying in ZZRVTC
Secretariat of IATU-APC
About the IATU-APC
Members
The 11th Seminar
Application for IATU-APC Membership
Activities
Secretariat
network university
IIPE-RTI
About the Institute
Information and Culture
Cooperation and Exchange
Research
Research Area
Teams
Achievements
Meeting Announcement
Application for Studying in ZZRVTC
Application for IATU-APC Membership
Application for Meeting
Application
homepage
IIPE-RTI
Cooperation and Exchange
Cooperation and Exchange
New progress has been made in the construction of the Jakarta-Bandung high-speed railway
SmoothCompletion of theConcretePouringfor the ZeroBlocks of 2 Main Piersin the Continuous Rigid Frame Bridgeof MaximumSpanOn March 27, the concrete pouring was completed smoothly for the zero blocks of 2 main piers in the continuous rigid frame bridge of maximumspanlocated in the Jakarta-Bandung high-speed railway. And, the segmental constructionwas going to take place, marking active construction progress for the Jakarta-Bandung high-speed railway project and providing reliabledata and technica
Writer:/write
31
2021.02.01 04:38:55
Check the Details
Strengthen the China-Europe Freight trains to better serve the Belt and Road initiative
Since the year, the Chinese railway carefully implemented the decision and arrangement of the central government for “Six Priorities” and “Stability in Six Areas”, adopted various active measures, and guaranteed the safe and unblocked transportation of the China-Europe Railway Express. Each railway unit sufficiently gave full play to the regional advantages, reinforced the transportation organization of the China-Europe Railway Express and better served the construction of “the Belt and Road”.Si
Writer:/write
41
2021.02.01 04:37:00
Check the Details
The Control project of the Laos section of the China-Laos railway, Konglang Village Tunnel, is completed
At 11:00 on the morning of April 29 in Beijing, the key control engineering in the Laos Segment of the China-Laos Railway-Ban Konlouang Tunnel was completed smoothly, which is 43 days ahead of the originaltime. This is another important progress made by the railway constructors ofChina and Laos to overcome the epidemic influence and securely and orderly promote the engineering construction.The head of the China-Laos railway company introduced that the Ban Konlouang Tunnel was the third longest t
Writer:/write
41
2021.02.01 04:34:43
Check the Details
China-Europe Railway Express Reflecting the Sense of Responsibility of China
Many trucks carrying the epidemic prevention and control materials queued up to access the customs inspection platform. Each container was stably loaded to the train by a giant gantry crane. And the train with the inspiring slogan was ready to start…At the important moment when the world was fighting against the COVID-19 epidemic, the China-Europe Railway Express carrying the epidemic prevention and control materials started one by one to Serbia, Spain and Italy, expressing the deep friendship
Writer:/write
40
2021.02.01 04:32:37
Check the Details
per page
14
records
total
4
records
firstpage
<<previouspage
nextpage>>
endpage
PageNumber
1
/
1
jumpto
Copyright:Zhengzhou Railway Vocational & Technical College
Copyright@2003 All Rights Reserved